INSPECTION
After receiving the unit, immediately check its integrity. The unit left the factory in perfect condition;
any eventual damage must be questioned to the carrier and recorded on the Delivery Note before
signing it. Our company must be informed within 8 days of the extent of the damage.
The Customer must prepare a written statement of any severe damage.
LIFTING AND SITE HANDLING
The lifting is obtained by using a forklift: fork must be inserted in the base pallet, and care must be
taken in order that the fork does not hit the section base or panel (see the picture below).
To unload the unit with a crane, pass bars under the machine and attach the necessary cable or chain
lifting devices to the bar, ensuring that they are clamped firmly; protect the sides of the chiller with
boarding or material of a similar nature.
UNPACKING
When unpacking the unit pay attention not to damage the unit.
The package is made up by different materials: wood, paper, nylon etc.
It’s a good rule to keep them separately and deliver to the proper collecting centre in order to reduce
their environmental impact.
Lifting method with a crane
Lifting method with a forklift
LOCATION
Consideration must be given to the following points when determining the most suitable site for the
unit installation:
location arrangement in order to guarantee adequate air flow (no narrow spaces);
electrical power supply location;
accessibility for servicing/maintenance and repair of the unit and/or its components;
floor loading strength and ability to support the operating weight of the unit;
Protection
Spacing bars
3m