background image

                              TSR 2800-20-DC Router’s Hardware Installation Manual

 

- 6 -

 

z

 

Read the installation guide carefully before you operate the system. 

z

 

Only professionals are allowed to install or replace the router. 

z

 

Pull out the AC power socket and close the direct-current power before 
operating on the chassis or working beside the power source. 

z

 

The final configuration of products must comply with relative national laws and 
regulations.

 

 

Safety Principles for Live Working 

z

 

Put off ornaments, such as ring, necklace, watch and bracelet, before you 
operate under live working. When metal articles connect the power to the ground, 
short circuit happens and components may be damaged. 

z

 

Pull out the AC power socket and close the direct-current power before 
operating on the chassis or working beside the power source. 

z

 

When the power is on, do not touch the power. 

z

 

Correctly connect the device and the power socket. 

z

 

Only professionals are allowed to operate and maintain the device. 

z

 

Read the installation guide carefully before the system is powered on. 

Note: 

1)   

Check potential dangers, such as the humid floor, ungrounded extensible power 
line and tatty power line. 

2)   

Install the emergent on-off at the working room for turning off the power when 
trouble happens. 

3)   Turn off the power on-off of the router and plug off the power line before 

installing or uninstalling the machine box or working beside the power. 

4)   

 Do not work alone if potential dangers exist. 

5)   

 Cut off the power before checkout. 

6)   

 If trouble happens, take the following measures: 

 A. Cut off the system’s power. 

B. Alarm. 

C. Take proper measures to help persons who are hit by the disaster. Artificial 

respiration is needed if necessary. 

D. Seek for medical help, or judge the loss and seek for available help.

 

 

Summary of Contents for TSR 2800-20-DC

Page 1: ...TSR 2800 20 DC Router s Hardware Installation Manual...

Page 2: ...3 1 Installation Procedure of TSR 2800 20 DC Router 9 3 2 Installing Router s Hull 9 3 2 1 Installing the Chassis on the Desk 10 3 2 2 Installing the Chassis on the Cabinet 10 3 3 Connecting the Port...

Page 3: ...th a rate of 1200bps to 57600bps which has no indicators USB port USB1 1 interface which has a rate of 1 5Mbps in low speed mode and a rate of 12Mbps in full speed mode There are also four interface c...

Page 4: ...er is shown in the following figure Table 1 3 Parts at the front template of TSR 2800 20 DC router No Abbrev Name Remarks 1 GND Grounding column The grounding must be fine 2 SLOT4 Slot 4 for expanded...

Page 5: ...e USB port 4 slots for interface card that is 2 slots for Network Interface Card NIC and 2 slots for expanded interface card Dimensions 442 5mm 425mm 44mm Working temperature humidity 0 40 10 85 non c...

Page 6: ...TSR 2800 20 DC Router s Hardware Installation Manual 4 1 3 ROHS Description...

Page 7: ...do not insert the console cable into the Ethernet twisted pair port RJ45 8 line socket Note 1 When you plug or dial out the power line keep the power line horizontal with the power socket 2 When the l...

Page 8: ...eside the power source z When the power is on do not touch the power z Correctly connect the device and the power socket z Only professionals are allowed to operate and maintain the device z Read the...

Page 9: ...evices bad ventilation and untouchable control plate will cause maintenance problems systematic faulty and breakdown For location planning and device locating refer to section 2 3 2 Location Configura...

Page 10: ...an be installed if necessary At least a 240 V and 10A fuse or a breaker is provided in the phase line if you prepare the short circuit prevention measures for a building Caution If the power supply sy...

Page 11: ...rocedure of TSR 2800 20 DC Router 3 2 Installing Router s Hull The hull of the router can be installed on the desk or can be fixed to other cabinets Your network installation requirements can be met i...

Page 12: ...he brackets the front template of the router faces forward The detailed operations are shown in the following figure Note The previous example only describes how to install the router s hull on one si...

Page 13: ...h specific monitor cable and then run terminal imitation software Windows super terminal The cable is provided according to the host The communication parameters of the terminal serial port can be set...

Page 14: ...e terminal device One end of the cable is a 8 pin RJ45 plug and the other end is a 9 hole plug DB9 The RJ45 plug is put into the socket of the console port on the TSR 2800 20 DC modularized router The...

Page 15: ...the data TPTXD Output 2 Sending the paraphase of the data TPTXD Output 3 Receiving the normal phase of the data TPRXD Input 6 Receiving the paraphase of the data TPRXD Input 3 Outside line connection...

Page 16: ...be saved during network connection However HUB must be used when more than two Ethernet UTP ports are interconnected See the following figure for UTP connection Note The color arrangement of UTP conn...

Page 17: ...ectly insert NIC into a slot Type of NIC Slot1 Slot 1 for interface card Slot2 Slot 1 for interface card Slot3 Slot 1 for interface card Slot4 Slot 1 for interface card No Module ID 1 Single path E1 c...

Page 18: ...en the cover of the router required tools and operation methods Caution When the power cable still connects the power source do not touch it When you open the cover the router you may use the followin...

Page 19: ...r uninstall and install SDRAM according to the following steps Turn off the power on off of TSR 2800 20 DC router and plug out the power plug Find the SARAM SIMM slot on TSR 2800 20 DC router accordin...

Page 20: ...cked Slowly break off the pinchcock at both sides of the SDRAM SIMM slot according to the previous method After taking off the original SDRAM bar make the brim of the gold finger of the SDRAM bar poin...

Page 21: ...d install the hull according to the procedure of closing the hull 4 3 Closing Chassis The section mainly describes how to put the cover and close the chassis Do as follows z Put them well according to...

Page 22: ...et and air inlet are clean and then do relative operations in section Requirements for Common Locations The working temperature of the router is from 0 to 40 Celsius degrees z If the router cannot be...

Page 23: ...e copy or change partial or all contents of this manual and must not broadcast it in any manner Trademark claims Trademarks product names service names and company names which are written in this manu...

Reviews: