TSR 2800-20-DC Router’s Hardware Installation Manual
- 8 -
z
Ensure that nice ventilation is provided for the devices installed at the bottom of
the cabinet.
z
The clapboard separates exhaust gas and inflow air, and boost the cool air to
flow in the chassis. The best location of the clapboard is decided by the air flow
mode in the chassis, which can be obtained through different location tests.
2.3.4 Power Requirements
Make sure that the power supply has nice grounding and the power at the input side of
the router is reliable. The voltage control can be installed if necessary. At least a 240 V
and 10A fuse or a breaker is provided in the phase line if you prepare the short-circuit
prevention measures for a building.
Caution:
If the power supply system does not have good grounding, or the input power disturbs
too much and excessive pulses exist, the error code rate of communication devices
increases and even the hardware system will be damaged.
2.4 Installation Tools and Device
The tools and devices to install the router are not provided. You need to prepare them
yourself. The following are the tools and devices needed for the typical installation of
the router:
z
Screwdriver
z
Static
armguard
z
Bolt
z
Cable for LAN connecting WAN
z
HUB or PC with Ethernet card
z
Control
terminal
z
MODEM