
Version 5.0 DUT-E Installation Manual
© 2007-2011, JV Technoton 21 of 30
2.11 Sealing
Sealing of the DUT-E is carried out by means of cord and disposable plastic seal (included in
delivery set).
In order to seal the sensor you need to put the cord through the sealing holes of the
mounting plate and DUT-E housing, after that put the free cord ends through two openings
in the center of the seal. The cord will be fixed after the seal has been locked.
Separation of the seal without its breaking is not possible!
If necessary, you can use seals of other models and manufacturers.
ATTENTION!
The cord of the seal shouldn’t touch the tank!
Fig.19. DUT-E sealing