4.2.6
Single Process Operation
Action of the Process Start buttons is inhibited until the heater LED has
changed to green.
Operation of any individual Start button during the timer count-down will
manually override the process and move the heater chamber to the rear.
Fig. 3-1: Initiating the Operating Cycle
1.
Check from main interface, if correct process button has been selected for the cable assembly to
be processed. And the heater indicator lit green.
Note: This will be selected automatically if the Processor is being controlled remotely.
2.
Select the correct size (ILS. / QSZH) product (Code 1; 2; 3; 3A) and position over splice to be
processed.
3.
Insert the cable splice into the Processor grippers. Align the center of the splice and product ends,
with the guide markers on the Perspex shield and Guard.
4.
Press on both START CYCLE buttons simultaneously for at least 0.5s. The heater carrier will
move forward to load position.
Note: Press each START CYCLE button to interrupt cycle, the heater carrier will back to
home position immediately.)
5.
Check from main interface that the process Cycle indicator lit green.
6.
Check that the Timer Display start to count down.
7.
When the Timer reaches zero, the heater will move backward to home position, and the processed
splice will be ejected.
Note: TAKE CARE WHEN HANDLING THE EJECTED CABLE SPLICE AS IT WILL BE HOT.
8. Without selecting another process button, the next cycle will continue the last selected process.