98
*OPC
Operation Complete command. Sets the Operation Complete bit in the Standard Event Status
Register if all commands and queries are completed.
Meaning and Type
Operation Complete
Device Status
Command Syntax
*OPC
Parameters
None
*OPC?
Operation Complete query. Returns ASCII ‘1’ as soon as all commands and queries are completed.
Meaning and Type
Operation Complete
Device Status
Query Syntax
*OPC?
Parameters
<NR1> ASCII 1 is placed in the Output Queue when the
power supply has completed operations.
*OPT?
The options (OPT) query returns a comma-separated list of all of the instrument options currently
installed on the signal generator.
Parameter
Option
0
NONE
1
IEEE
2
LAN
3
BOTH
Query Syntax
*OPT?
Returned Parameters
<CRD>
*PSC
The Power-On Status Clear (PSC) command controls the automatic power-on clearing of the
Service Request Enable Register, the Standard Event Status Enable Register, and device-specific
event enable registers.
•
ON(1) - This choice enables the power-on clearing of the listed registers.
•
OFF(0) - This choice disables the clearing of the listed registers and they retain their status
when a power-on condition occurs.
Meaning and Type
Power-on Status Clear Device Initialization
Command Syntax
*PSC <bool>
Parameters
0 | 1 | OFF | ON
Example
*PSC 0 *PSC 1
Query Syntax
*PSC?
Returned Parameters
<NR1> 0 | 1
Summary of Contents for Z160-1.3
Page 5: ...This page intentionally left blank...
Page 27: ...26 Pages 26 33 are reserved for Z600 800W...
Page 28: ...27 Pages 26 33 are reserved for Z600 800W...
Page 29: ...34 2 6 Z200W 400W 600W 800W Outline Drawing...
Page 30: ...35 2 7 Z200W 400W 600W 800W Optional IEEE Isolated Analog Interface Outline Drawing...
Page 31: ...36 This Page intentionally left blank...
Page 137: ...NOTES...
Page 138: ...NOTES...
Page 139: ...NOTES...