新建文件夹
(3)Test and Alignment Specification for NT63
Series (v0 01) 170612
Page 6 of 25
INFO:
All tests and measurements mentioned hereafter have to be carried out at a normal mains voltage (
220 ~ 240 VAC
)
All voltages have to be measured with respect to ground, unless otherwise stated
All final tests have to be done on a complete set including LCD panel in a room with temperature of
25+/-7°C
The Picture Performance assessment such as White Balance (luminance and colour temperature) has to be
performed into subdued lighted room after at least
45min
of warm-up in order to avoid any temperature drift influence
(colorimetric vs. time)
1. PCB/SKD Assembly: Test & Alignment
1.1. Pre-Conditions and DC/DC Check
Before power-on, please check the board according to the relevant block diagram and circuit diagram, and make
sure that no serious issue or mistake can destroy the board. For example, the output of DC/DC and LDO should not be
shorted to ground.
Supply a suited voltage and power-on, then check the voltage according to the relevant block diagram, circuit
diagram and voltage specification.
For example, check SoC voltage (3V3, 1V8, CORE_1V2, 5V, 5VSTB, etc.), DDR voltage (DDR_1V5), audio
amplifier voltage (12V), etc...
Measurements should fulfill specification within ±5% tolerances.
Note
①
:
See enclosed circuit diagram for more details.
1.2. SW Image download
Download the latest release SW from below FTP server:
- Link:
\\10.120.99.200\
- Username:
- Password:
- Folder: \\10.120.99.200\Software_release\Debugging_TS_SW\Novtek\NT563
1.2.1 LR or PR step. ---Only test
In case of starting from blanked flash / eMMC
, it’s necessary to use “Blank upgrade” to update the SW.
See Appendix
⑴
“
How to upgrade FLASH SW using Blank upgrade
”
See Appendix
⑵
“How to upgrade main SW using USB”
See Appendix
⑶
“How to upgrade main SW using USB and RCU”