User Manual of Solar Intelligent Energy System (SIES)
TBB Power Confidential Page
25
of
66
AC OUT L
L of AC output (line)
AC OUT N
N of AC output (neutral )
Pull the cables of AC input and AC output through the holes in front panel of Energier Pro,
The cables of AC inputs and AC outputs should be connected to right terminals respectively, and
must be tightly screwed.
4.5.1.3 Communication cable
There is a communication cable between the COM interface of Smart Box (left inside) and the
RS485 port of Eneriger Pro. Pull this communication cable through the hole at the left-top side
of the Smart Box to implement connection.
Carefully check the connections and make sure it is well connected.
4.5.2 Connect cable from Smart Box to Solar Mate MPPT
The connection cables between Smart Box and Solar Mate MPPT are: battery cables, PV cables
and communication cables.
4.5.2.1 Battery cables
Carefully check if the polarity marked on the battery cables and terminals of Solar Mate are the
same. The battery cables
marked with “BATT+” should be connected to “BATT+” terminal of
Solar Mate, and
the cable marked with “BATT-” should be connected to “BATT-” terminal in
Solar Mate.
Pull the battery cables through the holes in the front panel of Solar Mate,
T
he battery cables connected to “BATT+” and ”BATT-“ terminals of Solar Mate must be tightly
screwed.
4.5.2.2 PV cables
Carefully check if the polarity marked on the PV cables and terminals of Solar Mate are the
same. T
he cable marked with “PV+” should be connected to “PV+” terminal of Solar Mate, the
cable marked with “PV-” should be connected to “PV-” terminal of Solar Mate.
Pull the battery cables through the holes in the front panel of Solar Mate.
T
he battery cables connected to “PV+” and ”PV-“ terminals of Solar Mate must be tightly screwed.
4.5.2.3 Communication cable
There is a communication cable between the COM interface of Smart Box (right inside) and the
RS485 port of Solar Mate MPPT. Pull this communication cable through the hole at the right-top
side of the Smart Box to implement connection.
Carefully check the connections and make sure it is well connected.