![Taylor C723 Operator'S Manual Download Page 36](http://html.mh-extra.com/html/taylor/c723/c723_operators-manual_822762036.webp)
6-4
OPERATING PROCEDURES
Model C723
Operating Procedures
6
20. Slide the fork of the draw handle into the slot of the
draw valve, starting from the right.
Figure 6-13
21. Slide the pivot pin through each draw handle as it is
inserted into the draw valves.
Figure 6-14
Note:
This freezer features three adjustable draw
handles to provide portion control, giving a better
consistent quality to your product and controlling costs.
The draw handle should be adjusted to provide a flow
rate of 5 oz to 7-1/2 oz (148 ml to 222 ml) of product by
weight per 10 seconds.
22. To increase the flow rate, turn the adjustment screw
clockwise. Turn the adjustment screw
counterclockwise to decrease the flow rate.
23. Snap the design caps over the bottom of the door
spouts.
Figure 6-15
24. Slide the drip pan into the hole in the front panel.
\
Figure 6-16
25. Install the front drip tray and splash shield under the
door spouts.
Figure 6-17
10529
10530
10533
10176i
101428
Summary of Contents for C723
Page 14: ...3 4 SAFETY Model C723 Safety 3 Notes ...
Page 42: ...6 10 OPERATING PROCEDURES Model C723 Operating Procedures 6 Notes ...
Page 48: ...9 2 PARTS REPLACEMENT SCHEDULE Model C723 Parts Replacement Schedule 9 Notes ...
Page 52: ...10 4 LIMITED WARRANTY ON EQUIPMENT Model C723 Limited Warranty on Equipment 10 Notes ...
Page 56: ...11 4 LIMITED WARRANTY ON PARTS Model C723 Limited Warranty on Parts 11 Notes ...