OPERATING PROCEDURES
6-5
Model C302 NPR
Operating Procedures
6
18. Insert the valve handle pin. Turn the pin and the draw
valve handle until the pin drops completely into place.
Note:
While turning the draw valve handle, it may be
necessary to pull the draw valve handle back slightly to
allow the pin to fall in place.
Figure 6-15
19. Place the O-ring onto the prime plug and lubricate.
Figure 6-16
20. Screw the prime plug into position on the front of the
door.
Figure 6-17
21. Place the large rubber gasket into the groove on the
back side of the freezer door.
Figure 6-18
101610
11145
Apply the appropriate
Taylor approved food safe lubricant.
HP
101596
101601
Summary of Contents for C302NP
Page 10: ...1 6 TO THE INSTALLER Model C302 NPR To the Installer 1...
Page 16: ...3 4 SAFETY Model C302 NPR Safety 3 Notes...
Page 20: ...4 4 OPERATOR PARTS IDENTIFICATION Model C302 NPR Operator Parts Identification 4 Notes...
Page 44: ...7 2 OPERATOR CHECKLIST Model C302 NPR Operator Checklist 7 Notes...
Page 48: ...9 2 PARTS REPLACEMENT SCHEDULE Model C302 NPR Parts Replacement Schedule 9 Notes...
Page 54: ...11 4 LIMITED WARRANTY ON PARTS Model C302 NPR Limited Warranty on Parts 11 Notes...