OPERATING PROCEDURES
6-3
Models 702/741/772
Operating Procedures
6
Figure
6-7
7. Insert the baffle rod through the beater in the freezing
cylinder. With the door seated on the freezer studs,
install the handscrews. Tighten equally in a
crisscross pattern to ensure that the door is secured.
Figure
6-8
8. Rotate the draw valve bracket to the
left.
Center it
into position by raising the draw arm and placing it
into the slotted groove of the draw valve bracket.
Figure
6-9
9. Snap the design cap over the end of the door spout.
Figure
6-10
10. Lay the mix feed tube and the hopper gasket in the
bottom of the mix hopper.
Repeat steps 1 through 9
for the other side of the
freezer on Model 772.
11. Install the front drip tray and splash shield under the
door spout(s).
Figure
6-11
12. Slide the rear drip pan into the hole(s) in the side
panel.
11104
10177
10178
10179
10180
Summary of Contents for 741
Page 10: ...1 6 TO THE INSTALLER Models 702 741 772 To the Installer 1...
Page 32: ...6 8 OPERATING PROCEDURES Models 702 741 772 Operating Procedures 6 Notes...
Page 38: ...9 2 PARTS REPLACEMENT SCHEDULE Models 702 741 772 Parts Replacement Schedule 9 Notes...
Page 44: ...11 4 LIMITED WARRANTY ON PARTS Models 702 741 772 Limited Warranty on Parts 11 Notes...