
Fill kits are available with different combinations of hose length and fittings for a specific
gas service. The following chart identifies the available transfer hoses and fill tee assem-
blies.
TRANSFER HOSE CHART
Description
Cylinder
End
Part
(Service/Hose Length)
Connections(s)
Fittings
Number
Inert (N2,Ar) Service
4 ft. (1.2 m) Stainless Steel
LIQUID or VENT Valve
CGA 295 to 3/8 in. NPT
1700-9C65
6 ft. (1.8 m) Stainless Steel
LIQUID or VENT Valve
CGA 295 to 3/8 in. NPT
1600-9C66
6 ft. (1.8 m) Stainless Steel
USE Valve
CGA 580 to 3/8 in. NPT
GL50-8C51
Oxygen Service
6 ft. (1.8 m) Stainless Steel
LIQUID or VENT Valve
CGA 440 to 3/8 in. NPT
GL-8C53
6 ft. (1.8 m) Stainless Steel USE Valve
CGA 540 to 3/8 in. NPT
GL50-8C56
VENT TEE CHART
The vent tee connects to transfer hose to complete a fill line kit. Each assembly includes
a 3/8 in. pipe connector to CGA fitting with a 350 psig (24 bar/2413 kPa) relief valve, and
a ball-type dump valve.
Fill Hose Kits