tams elektronik
t
a
ms elektronik
HADES
4.7. Setting up a stopping section at the entrance to the staging yard
Instead of installing a transit track, you can set a stopping section at the entrance to the
staging yard, where a train must stop when all sidings are fully occupied. To configure HADES
accordingly, you must plug a short-circuit connector (jumper) onto the marked pin headers on
the basic module.
Controlling the stopping section at the entrance to the staging yard
When setting up a stopping section at the entrance to the staging yard, there is no entry
turnout required for the last siding, which is monitored by the last track module. The
connections 9, 11 and 13 of the last track module are used in this case for the control of the
stopping section.
Direct connection of the tracks in the halt section
To de-energise the stopping
section when the staging yard
is fully occupied, connect the
tracks to the last track
module via a relay board RL-2
(or a bistable relay).
If you want to control a signal
together with the stopping
section, connect it as follows:
Semaphore signal (coil-
driven): in parallel to the
relay to the connections 9,
11 and 13 of the track
module
Light signal: to the 2nd
change-over switch of the
relay board or the relay
(2xUm)
Connections | 25