Chapter 4.
Removing and Replacing Components
63
4.9 Removing the Hammer Bank
1.
Follow the instructions for removing the Operator Panel and Right-end cover.
2.
Follow the instructions for removing the Ribbon Platform.
3.
Release the Hammer Bank Ribbon Cable guides
–
squeeze tab at back edge then lift
gently (two places for the 6306 and four for the 6312).
Squeeze tab and lift
Remove Screws
4.
Unplug the Hammer Bank Ribbon Cables (see above).
5.
Loosen the screw holding the cable assembly strain relief clamp then slide the clamp
to the right and out of the hammer bank assembly.
Loosen screw –
Slide clamp to right
Summary of Contents for 6306
Page 1: ......
Page 24: ...6300 Series Maintenance Manual 18 ...
Page 54: ...6300 Series Maintenance Manual 48 ...
Page 83: ...Appendix A Drawings 77 Appendix A Drawings 6306 Drawings ...
Page 110: ......
Page 111: ......
Page 112: ......
Page 115: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ...6300 Series Maintenance Manual 78 6312 Drawings ...
Page 155: ......
Page 156: ......
Page 157: ......
Page 158: ......
Page 161: ......
Page 167: ......
Page 168: ......
Page 169: ......
Page 170: ......
Page 171: ......
Page 172: ......
Page 173: ......
Page 174: ......
Page 175: ......