119
MAINTENANCE
Every 250 Hours
8. Light up the inside of the element (3) with
a bulb, inspect it, and replace it if there
are small holes or thin spots.
9. Remove the cloth or tape applied in step 5.
10. Install the element (3).
11. Install the dust cup (2) with the “TOP”
mark at the top, then fasten it with the
clamp (1).
E4G034
J1G007
1
2
3
4
Summary of Contents for TB53FR
Page 6: ...4...
Page 8: ...6...
Page 91: ...89 TRANSPORT Loading and Unloading 90 Securing the Machine 91 Cautions on Transporting 92...
Page 140: ...138...
Page 152: ...150...
Page 156: ...154 SPECIFICATIONS Machine Dimensions J1K0011 N L M D Q P J H K C F G A S E B R T U...
Page 158: ...156 SPECIFICATIONS Operating Range J1K0021 D J H K C F G A E B...
Page 160: ...158 MEMO...
Page 168: ...166...
Page 174: ...172 MEMO...
Page 186: ...184...
Page 187: ...185 INDEX...