![background image](http://html1.mh-extra.com/html/takeuchi/tb260/tb260_operators-manual_3344698005.webp)
0-3
FRONT, REAR, LEFT AND RIGHT
MACHINE DESCRIPTION
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
DESIGNATED OPERATIONS
Use this machine primarily for the following
operations:
• Excavation
• Digging ditches
• Digging side ditches
• Leveling
• Loading
FEATURES
• Adopting the auto-idle enables less fuel
consumption
• Equipping the auxiliary 1st and 2nd lines
with a flow rate control mechanism
• Configuring the auxiliaries of 2nd, 3rd
(high-pressure type) and 4th.
• Legible instrument cluster with a 5-inch
color LCD
• Smaller rear slew radius, smaller turns
(stability is retained)
• Installing the ROPS certified large cab (with
front sash assist)
• Adopting the larger engine hood and right
side cover allows easier maintenance
• Optional angle dozer blade with a float
BREAK-IN PERIOD
When the machine is new, operate the
machine for the first 100 hours (as indicated
on the hour meter) by following the
instructions below.
Using a new machine without a break-in
period will lead to quicker deterioration of
machine performance and may shorten the
machine’s service life.
• Sufficiently warm up the engine and
hydraulic oil.
• Avoid heavy loads and rapid operations.
Operate with a load of about 80% the
maximum load.
• Do not abruptly start up, accelerate,
change directions, or stop unless
necessary.
Summary of Contents for TB260
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS Applicable machine models 126100003 or later...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38 SAFETY SAFETY SIGNS DECALS...
Page 49: ...1 39 SAFETY SAFETY SIGNS DECALS...
Page 50: ...1 40...
Page 51: ...2 1 CONTROLS...
Page 111: ...2 61 MEMO...
Page 121: ...2 71 MEMO...
Page 135: ...3 1 OPERATION...
Page 163: ...4 1 TRANSPORT...
Page 167: ...4 5 TRANSPORT HOISTING THE MACHINE...
Page 169: ...5 1 MAINTENANCE...
Page 236: ...5 68...
Page 237: ...6 1 TROUBLESHOOTING...
Page 245: ...6 9 MEMO...
Page 264: ...6 28...
Page 265: ...7 1 SPECIFICATIONS...
Page 268: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 270: ...7 6 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 272: ...7 8 MEMO...
Page 286: ...7 22...
Page 287: ...8 1 OPTIONS OPTIONS...