5-59
MAINTENANCE
Installation
WHEN REQUIRED
1. Set the O-ring (4) on the bucket as shown
on the figure above.
2. Align the pin hole (A) on the bucket with
the pin hole on the arm (5), and install the
pin (2).
3. Operate the cylinder, align the pin hole (B)
on the bucket with the pin hole on the link
arm (6), and install the pin (2).
4. Align the turn prevention holes, and then
install the bolt (1) and the nut. Be sure to
leave a gap of about 0.5 to 1 mm (0.02 to
0.04 in.) between the nut and bucket
bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm.
Refer to “Adjusting the gap between the
bucket and arm (If equipped)” on page
5-60.
6. Slide the O-ring (4).
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the figure above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
Summary of Contents for TB260
Page 1: ......
Page 11: ...1 1 SAFETY...
Page 46: ...1 36 SAFETY SAFETY SIGNS DECALS Applicable machine models 126100003 or later...
Page 47: ...1 37 SAFETY SAFETY SIGNS DECALS...
Page 48: ...1 38 SAFETY SAFETY SIGNS DECALS...
Page 49: ...1 39 SAFETY SAFETY SIGNS DECALS...
Page 50: ...1 40...
Page 51: ...2 1 CONTROLS...
Page 111: ...2 61 MEMO...
Page 121: ...2 71 MEMO...
Page 135: ...3 1 OPERATION...
Page 163: ...4 1 TRANSPORT...
Page 167: ...4 5 TRANSPORT HOISTING THE MACHINE...
Page 169: ...5 1 MAINTENANCE...
Page 236: ...5 68...
Page 237: ...6 1 TROUBLESHOOTING...
Page 245: ...6 9 MEMO...
Page 264: ...6 28...
Page 265: ...7 1 SPECIFICATIONS...
Page 268: ...7 4 SPECIFICATIONS MACHINE DIMENSIONS MACHINE DIMENSIONS...
Page 270: ...7 6 SPECIFICATIONS OPERATING RANGES OPERATING RANGES...
Page 272: ...7 8 MEMO...
Page 286: ...7 22...
Page 287: ...8 1 OPTIONS OPTIONS...