
75
OPERATION
Machine Operation
Slewing
WARNING
Check the surrounding area for safety
before slewing.
a
To slew left:
Tilt the left operating lever to the left.
e
To slew right:
Tilt the left operating lever to the right.
Operating the Boom
a
To lower the boom:
Tilt the right operating lever forward.
e
To raise the boom:
Tilt the right operating lever backward.
Operating the Working
Equipment
WARNING
¡
¡
¡
¡
¡
Be careful to check which pattern of
lever control arrangement you are
operating with before beginning
operations.
¡
¡
¡
¡
¡
The explanations in this manual are for
the ISO pattern.
Use the right operating lever to operate the
boom and bucket.
Use the left operating lever to operate the
arm and for slewing.
Return the operating levers to the neutral
position to stop the hoe attachments.
1. Set the safety lock lever to the released
position.
2. Set the pedal lock to the released position.
C4D006
E4D021
E4D022
Summary of Contents for TB175
Page 7: ...4...
Page 9: ...6...
Page 157: ...154...
Page 160: ...157 MEMO...
Page 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Page 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Page 169: ...166 MEMO...
Page 183: ...180...
Page 223: ...220...
Page 224: ...221 INDEX...