
3
■
Front, rear, Ieft and right
This manual refers the front, rear, left and
right of the machine as seen when sitting in
the operator’s seat with the dozer blade
visible to the front.
■
Designated operations
Use this machine primarily for the following
operations:
¡
Excavating
¡
Digging ditches
¡
Digging side ditches
¡
Leveling
¡
Loading
■
Features
¡
Automatic travel shift-down system.
¡
Isolation mounted cab minimizes vibration.
¡
Short pitch rubber crawler.
¡
Low engine noise and exhaust emissions.
¡
Electro over hydraulic control of auxiliary hydraulic circuit.
¡
One touch engine deceleration button.
¡
Two-speed slew allows the operator to slow the excavators slew speed.
¡
Engine emergency stop/idle system.
¡
Self-adjusting hydraulic crawler tension system.
¡
Travel motor are equipped with shock less valves for smooth starts and stops.
■
Break-in period
When the machine is new, heed the instructions below when operating the machine for the
first 100 hours (as indicated on the hour meter).
Using a new machine roughly without breaking it in will lead to quicker deterioration of machine
performance and may shorten the machine’s service life.
¡
Warm up the engine and hydraulic oil sufficiently.
¡
Avoid heavy loads and rapid operations. Operate with a load of about 80% the maximum
load.
¡
Do not start up, accelerate, change directions, or stop abruptly unless necessary.
MACHINE DESCRIPTlON
E3A020
FRONT
LEFT
RIGHT
REAR
Dozer blade
Summary of Contents for TB175
Page 7: ...4...
Page 9: ...6...
Page 157: ...154...
Page 160: ...157 MEMO...
Page 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Page 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Page 169: ...166 MEMO...
Page 183: ...180...
Page 223: ...220...
Page 224: ...221 INDEX...