
135
MAINTENANCE
When Required
3. Operate the cylinder, line up pin hole (B)
in the bucket with the pin hole in the link
arm (6), and install the pin (2).
4. Line up the turn prevention holes, install
the bolt (1), and the nuts.
Be sure to leave a gap of about 0.5 ~ 1
mm (0.02 ~ 0.04 in.) between the nut and
bucket bush, or the nut will come loose.
5. Adjust the gap between the bucket and
the arm. Refer to page 132.
6. Slide the O-ring (4).
E4G055
0.5~1mm
1
E4G056
4
E4G057
3
Replacing the pin seal
1. Set the pin seal (3) in the direction shown
on the diagram above.
2. Use a mallet to slowly press the pin seal
in. Be careful not to damage the seal.
Summary of Contents for TB175
Page 7: ...4...
Page 9: ...6...
Page 157: ...154...
Page 160: ...157 MEMO...
Page 165: ...162 SPECIFICATIONS Operating Range Mono Boom L3K0021 J K H B A E F C D G...
Page 167: ...164 SPECIFICATIONS Operating Range 2 Piece Boom L3L032 J E F G C D K H B A...
Page 169: ...166 MEMO...
Page 183: ...180...
Page 223: ...220...
Page 224: ...221 INDEX...