
TB9300 Installation and Operation Manual
Installation
91
© Tait Limited March 2016
5.6
Connecting Up the Base Station
This section provides information relevant to the task of connecting up the
various inputs and outputs of the base station.
5.6.1
Connection Overview
The connections at the rear of a dual 50W base station are identified in
Figure 5.9
. External connections are all located at the rear of the subrack.
Figure 5.9
50W base station inputs and outputs
b
serial RS-232 connector
a
h
+VDC input
c
1PPS input
i
auxiliary DC output
d
external reference frequency input
j
AC mains input
e
RF input
1)
Ethernet interface connector
f
RF output
1!
subrack ground connector
g
–VDC input
1@
system interface connector
a. Factory use only.
PA 1
Reciter 1
PMU
b c d e
f
g
h
i
j
1)
1!
1@
PA 2
Reciter 2
Summary of Contents for TB9300
Page 10: ...10 Preface TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 32: ...32 Description TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 76: ...76 Installation TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 102: ...102 Troubleshooting TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 116: ...116 Replacing Modules TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 138: ...138 TB9300 Installation and Operation Manual Tait Limited March 2016...