TB9300 Installation and Operation Manual
Installation
87
© Tait Limited March 2016
5.5.3
Mounting the Subrack
Caution
A subrack complete with modules can weigh up to 62lb
(28kg), or up to 66lb (30kg) complete with packaging. We recommend
that you have another person help you unpack and move the equipment.
The TBAA03-16 carrying handles will make it easier to move the
equipment once it has been unpacked. If necessary, remove the modules
from the subrack before moving it (refer to
“Replacing Modules” on
page 103
). In all cases follow safe lifting practices.
1.
Remove the front panel, as described in
“Preliminary Disassembly”
on page 105
.
2.
Fit the subrack into the cabinet or rack and secure it firmly with an
M6 (0.25in) screw, flat and spring washer in each of the four main
mounting holes
b
, as shown in
Figure 5.5
.
If you need extra mounting security, additional mounting holes
c
are
provided at the rear of the subrack for auxiliary support brackets.
Figure 5.5
Subrack mounting points
b
main mounting holes - front
c
auxiliary mounting holes - rear
front view
rear view
b
c
Summary of Contents for TB9300
Page 10: ...10 Preface TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 32: ...32 Description TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 76: ...76 Installation TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 102: ...102 Troubleshooting TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 116: ...116 Replacing Modules TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 138: ...138 TB9300 Installation and Operation Manual Tait Limited March 2016...