
18
Description
TB9300 Installation and Operation Manual
© Tait Limited
March 2016
Figure 1.3
below shows the configuration for a typical 100 W base station.
The PMU occupies slots 5 and 6, with the PA directly beside it in slots 3
and 4. The reciter occupies slot 1. Unlike the 50W PAs, the 100W PA is
mounted horizontally with the heatsink facing upwards. It is also fitted with
an airflow duct to channel the airflow from the cooling fan through the
heatsink fins.
Figure 1.3
Mechanical assembly - single 100W base station
b
PMU
e
reciter
c
PA
f
subrack
d
airflow duct
g
cable retaining clip
b
c
d
e
f
g
Summary of Contents for TB9300
Page 10: ...10 Preface TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 32: ...32 Description TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 76: ...76 Installation TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 102: ...102 Troubleshooting TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 116: ...116 Replacing Modules TB9300 Installation and Operation Manual Tait Limited March 2016...
Page 138: ...138 TB9300 Installation and Operation Manual Tait Limited March 2016...