![Tait TB8100 User Manual Download Page 51](http://html2.mh-extra.com/html/tait/tb8100/tb8100_user-manual_3305247051.webp)
TB8100 Service Kit User’s Manual
Setting Up and Configuring Connections 41
6. Leave the
Port
box displaying 10001, except when NAT requires the use
of a different TCP port.
7. Set polling intervals that are appropriate to the speed of your connection.
The
Alarms
and
Monitoring
boxes specify the interval from one Service
Kit poll of the base station to another.
8. Click
OK
. The new connection now appears in the Connections dialog box.
Copying a connection
Once you have a connection of a particular type, you can use the Copy button
as a quicker way of adding a new connection. This is particularly useful for
connections that use an asynchronous port switch.
To copy a connection
1. Select Tools > Configure Connections. The
Connections
dialog box
appears.
2. Click a connection to select it.
3. Click
Copy
. The Copy connection dialog box appears, containing settings
copied from the selected connection.
4. Edit the connection as needed. For details, see
.
Editing a Connection
You may need to modify the settings of an existing connection, for example, if
a telephone number changes or if the link is too slow for the polling intervals
you selected.
To edit a connection
1. Select Tools > Configure Connections. The
Connections
dialog box
appears.
2. Click a connection to select it.
3. Click
Edit
. The Edit Connection dialog box appears.
4. Modify the settings as desired. For information about individual settings, see
“Adding a Connection” on page 37
.
5. Click
OK
.
Working with the Connections Tree
The Connections dialog box displays the available connections in a tree
structure.
Summary of Contents for TB8100
Page 1: ...TB8100 base station Service Kit User s Manual MBA 00010 08 Issue 8 December 2007...
Page 8: ...vi Contents Tait Electronics Limited December 2007...
Page 12: ...2 Introduction Tait Electronics Limited December 2007...
Page 26: ...16 Part A Introduction Tait Electronics Limited December 2007...
Page 28: ...18 Getting Started Tait Electronics Limited December 2007...
Page 38: ...28 Part B Getting Started Tait Electronics Limited December 2007...
Page 40: ...30 Basic Tasks Tait Electronics Limited December 2007...
Page 74: ...64 Part C Basic Tasks Tait Electronics Limited December 2007...
Page 76: ...66 Monitoring Tait Electronics Limited December 2007...
Page 88: ...78 Part D Monitoring Tait Electronics Limited December 2007...
Page 90: ...80 Configuring the Base Station Tait Electronics Limited December 2007...
Page 106: ...96 Part E Configuring the Base Station Tait Electronics Limited December 2007...
Page 108: ...98 Configuring Channels Tait Electronics Limited December 2007...
Page 154: ...144 Part F Configuring Channels Tait Electronics Limited December 2007...
Page 156: ...146 Alarms Tait Electronics Limited December 2007...
Page 176: ...166 Part G Alarms Tait Electronics Limited December 2007...
Page 178: ...168 Diagnosing Tait Electronics Limited December 2007...
Page 198: ...188 Part H Diagnosing Tait Electronics Limited December 2007...
Page 200: ...190 Task Manager Tait Electronics Limited December 2007...
Page 254: ...244 Tait General Software Licence Agreement Tait Electronics Limited December 2007...