- 28 -
Ⅲ
Ⅲ
Ⅲ
Ⅲ
. The operating procedure of automatically control generator
1.
Inspection and connection before use the generator
A.
lock switch: place to “OFF”
B.
control switch: place to “OFF”
C.
connecting AC220V and install L, N and E respectively by
qualified electrician.
D.
connecting to 12V battery (if the L and N is misinstalled, the
control system would not work well. AC is forbidden to
connected on this)
2.
The condition of automatically control
A.
Stand-by condition:
Put lock switch, control switch and circuit protector to “ON”
and put the choke fully opened, then the work indicating light
would be open, generator enter into the automatically controlled
condition. The outlet power is available.
B.
Automatically controlled condition
If the power network is power off, the work indicating light
would be off, the choke would be automatically controlled and
output according to surrounding temperature.
If the power network is power on, the work indicating light
would be on, generator enter into the automatically controlled
condition. The outlet power is available.
C.
Alarming control condition:
If the power network is power off, generator would be stop
startup by 3-5 times of failure startup. If the work indicating light
is alarming, please check motor oil, gasoline, battery and the choke
switch. After the clearing problem, put control switch to “OFF” 2
minutes later, put it to “ON” re-entering into the condition of
automatically control.
Summary of Contents for TI9000LXU
Page 1: ... 1 ...
Page 15: ... 13 7 Mainte nance ...
Page 19: ... 17 9 Troubleshooting The engine can not start ...
Page 20: ... 18 There is no Voltage Check the circuit protector Check the spark plug ...
Page 32: ... 30 ...
Page 33: ... 31 ...
Page 34: ... 32 ...