SKY
-
26
-
POWER SUPPLY
MAIN SWITCH
7.5 Wiring the Packaged Unit
7.6 Finishing the Job
•
Hide the tubing wherever possible.
•
Make sure that the drainage tube slopes downstream along its entire length.
•
Insulate tubing connections with insulation materials.
•
Fasten tubes to the outside wall.
•
Seal the hole through which the cables and tubing are passing.
•
Connect the air conditioner to the power source. Check all air conditioning operating
modes. Consult the user manual.
7.7 Check List
Follow this check list:
•
Does the drainage work?
•
Are there unusual noises or vibrations during operation?
•
Is noise, drain water or air flow from the unit likely to disturb the neighbors?
•
Are there any gas leakages?
Summary of Contents for AVL-200
Page 9: ...SKY 9 4 Refrigeration Cycle...
Page 12: ...SKY 12 6 Electrical Wiring Diagram...
Page 13: ...SKY 13...
Page 14: ...SKY 14 NOTES...
Page 22: ...SKY 22 NOTES...
Page 32: ...SKY 32 NOTES...
Page 35: ......
Page 36: ...EN POWER SKY AVL AVR 200 300 V01 R01 JUN 2005...