36
WY05-4490E
Y-6
Y-6
Assembly Adjustment (Crane Operation)
9.1 Tighten two nuts-
C
by approximately a third turn equally.
9. When only the 4th boom section is not fully retracted:
9.2 Extend the boom by 200 to 300mm (8 to 12 in) by operating the boom telescoping
control lever and then retract it fully. Check the boom is fully retracted.
END
OK
NG
Summary of Contents for GR-500EXL-3
Page 1: ......
Page 8: ...7 WA04 4610E 6 Group index System Diagrams Data Adjustment and Checks Y Z Y Z...
Page 102: ...Z 7 Z 7 Hydraulic Parts Location Diagram Lower 31 WZ07 3950E 2 Steering 2 346 418 02000...
Page 108: ...37 WZ08 0590E Z 9 Z 9 Pneumatic Parts Location Diagram 3 Control parts lower 4 349 232 60000...