Instructions for unloading on the site as well as installation and connection |
17
Caution
If the base frame have 4 holes for forks as shown, the section/unit must be lifted evenly by 2 manual
hydraulic hand trucks in each side. Hereby 4 manual hydraulic hand trucks must be used. There is a risk of
overturning causing injury and damage to property if a section/unit is lifted unevenly or only by one manual
hydraulic hand truck in each side.
Caution
Avoid to activate the wheels on manual hydraulic hand trucks over horizontal profiles of base frames
I.1.9
Roof unit with PVC, flat sheet steel plates or bitumen
Avoid damaging the drip nose profiles along the PVC or bitumen roof. Keep the protection profiles of Styrofoam on the
unit until the installation has been completed. If the unit is lifted by straps, the straps must be kept away from the drip
nose profiles by bars to avoid damage to roofing profiles.
I.1.10
Roof unit with steel roof
Caution
For units with steel plate roof, the steel plates are delivered uninstalled on a separate pallet. Do
not
step or
walk on the plates.
I.1.11
Pre-assembly storage
The AHU must be protected from the weather and accidental impact. Plastic packaging
must
be removed and the unit
covered with tarpaulin or similar materials. In order to minimize condensation, sufficient air circulation must be ensured
between the covering and the unit.
output |