![Symmetricom 5115A Operation And Maintenance Manual Download Page 13](http://html.mh-extra.com/html/symmetricom/5115a/5115a_operation-and-maintenance-manual_1419632013.webp)
5120A/5115A Operations and Maintenance Manual
7
2: Setting Up a PNTS
You should read the safety information below before setting up the test set. For more information,
see the following:
“2.2 Setting Up a 5120A or 5115A”
on page 7
“3: The Screen and Basic Concepts”
on page 11
“4.1.1 Setting Date and Time”
on page 22
“4.1.2 Network Configuration”
on page 23
“4.1.4 Viewing Version Information”
on page 29
2.1 Safety Information
Warning
This unit is for indoor use only. It is not sealed to prevent moisture from entering the enclosure.
Do not set up or operate this equipment if you have not first received proper training.
Ensure that all cables are properly connected. The power cord must be located for easy removal.
Verify that input line voltage and current capacity from the supply circuit are within specifications
before turning on power to the test set.
Operating and maintenance personnel must receive proper training before setting up or
maintaining electrical equipment.
2.2 Setting Up a PNTS
The test set ships ready to set up on a desk, table, or other stable, flat surface.
Required for setup:
North American or European IEC power cord. One or the other will be supplied with the
instrument.
Two TNC male to BNC female adapters are supplied with the instrument.
Two customer-supplied 0.5-meter (approximately 19") coaxial cables terminated at one
end with male BNC connectors. The other end should have the appropriate connector as
determined by your application.
Summary of Contents for 5115A
Page 6: ...iv Contents Index 97 ...
Page 12: ...6 1 Introduction ...
Page 16: ...10 2 Setting Up a PNTS ...
Page 26: ...20 3 The Screen and Basic Concepts ...
Page 82: ...76 9 Maintaining a PNTS ...
Page 92: ...86 Appendix A Specifications ...
Page 98: ...92 Appendix B Theory of Operation ...
Page 100: ...94 ...
Page 102: ...96 ...
Page 106: ...100 ...