12
PlayHouse Assembly Instructions
E. Wall Supports
1. Attach 1’’ x 5’’ Drape, and Offset Arch boards as shown
in (Fig. 5).
2. Attach Barrier (2) Support Boards as shown in (Fig. 5)
and (Fig 5a).
Fig. 5
(3)
2-1/2’’ screws
per joint
(3)
2-1/2’’ screws
per joint
2-1/2’’ screw
1’’
x 5’’
x 47-1/2’’
Drape
Board
1’’x4’’x
19’’
1’’x4’’x
19’’
30-1/2’’
Fig. 5a
1’’x
5’’x
29’’
Offset Arch
(2)
2-1/2’’ screws
(2)
2-1/2’’ screws
per joint