![Swing-N-Slide Four Foot Tower Assembly Instructions Manual Download Page 55](http://html1.mh-extra.com/html/swing-n-slide/four-foot-tower/four-foot-tower_assembly-instructions-manual_1414272055.webp)
26
Five FootTower Assembly Instructions
Discovery Mountain
1. Install 2”x4” support board as shown in
(Fig. 19).
2. Install 2” x 4” x 17-1/4” stake in ground as
shown in (Fig. 19 & 19a) approximately
26” from left upright and 8” exposed from
ground.
3. Install Dicovery Mountain as shown in
(Fig.19b) using (4) 2” lag screws in top
flange, (2) 1-1/4” panhead screws through
left side flange and (1) 1-1/4” panhead
screw through right side of mountain into
2” x 4” stake.
Fig. 19
Fig. 19b
2’’
x 3’’
x 47’’
2’’ x 4’’ x 17-1/4”
(4)
2” lag screws
(3)
1-1/4” panhead
screws
(8)
2-1/2” screws
per board
(2)
2-1/2” screws
per joint
7”
2-1/2’’ screw
1 1/4” screw
Fig. 19a
26”
8”
2’’ Lag screw