![Swing-N-Slide Four Foot Tower Assembly Instructions Manual Download Page 34](http://html1.mh-extra.com/html/swing-n-slide/four-foot-tower/four-foot-tower_assembly-instructions-manual_1414272034.webp)
Look for ‘’TOP’’
stamp on brackets
while installing.
TOP
GAP on
this side
5
Five FootTower Assembly Instructions
59-1/4’’
Frame 2
Frame 2 Construction
1. Measure and position brackets on 3’’ x 3’’ as shown in (Fig.3).
Note: Secure Shelf Lock with (2) Lag Screws only at this time.
Fig. 3
Frame 2 Construction
3’’ x 3’’ x 94’’
(2)
1-1/4’’ Lag
Screws
per joint
1-1/4’’ Lag screw
(2)
1-1/4’’ Lag
Screws
per joint
Fig. 3a
DO NOT USE LAG SCREWS
HERE
Use Lag Screws Only Where Brackets
Attach