15.
Operation & Check-out Procedures
BEFORE YOU RUN WATER THROUGH THE SYSTEM:
TURNING THE SYSTEM ON
Turn the pool pump off.
Turn the 3-way valve so the “closed” indicator points toward the pool return side of the valve.
Be sure that the 2-way valves on the feed and return lines are open.
Turn the pool pump on.
Set the pool pump timer, if used, so that the pump will run when the sun is shining on the solar
panel
s;
usually 10:00 AM to 4:00 PM, but his will vary with geographical location and time of year.
When the solar system is running, you should notice:
Allow the cemented fittings adequate time to dry per manufacturer’s directions.
Verify that the check valves, control valves, and vacuum breakers are installed properly.
Verify that all plastic panel clamp
assemblies
are tight.
Pressure test the system as described on page 2
6
.
Verify that all anchors are secure and that adequate silicone was used to prevent any roof leaks.
Be sure all
panel
riser tubes are snapped into the spacer bars (except where they go around obstructions).
Be sure that the
panel
riser tubes are NOT rubbing on the roof surface between the spacer bars. If they are, adjust
the spacer bars as needed to prevent this or a hole may develop in the riser tube.
Be certain that the system will automatically drain down when the pump is shut off or that enough manual drain
valves have been installed.
Verify that all pipe runs are properly supported with pipe clamps.
•
A slightly higher pressure reading on the pressure gauge.
•
At midday, if the sun is out, warmer water should be coming into the pool. This water should be 3° to 5°F warmer than the
pool temperature. Use the back of your hand to better feel the difference in water temperature.
•
While the system is running a
ll the
panels
should feel cool to the touch when the sun is on them.
1.
1.
2.
2.
3.
3.
4.
4.
5.
5.
6.
6.
7.
8.
9.
INSTALLATION MANUAL - SWIM JOY SOLAR POOL HEATER
OPERATION & CHECK-OUT PROCEDURES
-
27