Page 2 of 7
28JUL09
11.
Once the overall hose length is adjusted, install between the C.V.S. hydraulic valve and
the hydraulic tank fittings (See drawing 90H85), and tighten.
12.
Remove both the hydraulic hose [Part No. 12P76] that connects from the upper bulkhead
fitting inside the mainframe to the jib lockout valve [Part No. 21P28] and the 90 & 45
degree hydraulic fittings [Part No. 11P23 & 12P09] installed into the top side of the jib
lockout valve (See drawing 90H79).
13.
Replace with hydraulic fittings [Part No. 12P69 (Qty: 2) & 13P04], hydraulic hose [Part
No. 11P98], and relief valve assembly [Part No. 21P93] and tighten (See drawing
90H85).
14.
Refill hydraulic tank to proper fluid level.
15.
Verify that the C.V.S. is operating properly. Start the truck, engage the P.T.O., and then
retract the jib cylinder full stroke. Next, while extending the jib cylinder back out have
someone push or rotate the C.V.S. lever arm forward (toward the back of the truck
cab). The C.V.S. is operating properly when the jib cylinder stops extending by
rotating the C.V.S. lever arm forward.
16.
Containers to be used in conjunction with the C.V.S. need modified by adding a stop tab
to the side of the container longsill (See drawing S-878). Dimensions given are a
recommendation only. When modifying containers for use with the C.V.S. it is the
primary responsibility of the installer to verify that adequate rear end overhang and
full latch plate engagement into body locks exists for each container.
Summary of Contents for SL-240
Page 1: ...Model SL 240 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 23: ...SL 240 INS 2 5 05 2020 ...
Page 25: ...SL 240 INS 2 7 05 2020 ...
Page 26: ...SL 240 INS 2 8 05 2020 ...
Page 31: ...SL 240 INS 2 13 05 2020 ...
Page 36: ...SL 240 INS 2 18 05 2020 ...
Page 41: ...SL 240 INS 2 23 05 2020 ...
Page 42: ...SL 240 INS 2 24 05 2020 ...
Page 43: ...SL 240 INS 2 25 05 2020 ...
Page 44: ......
Page 45: ......
Page 48: ......
Page 49: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 60: ......
Page 61: ......
Page 65: ...Page 3 of 7 28JUL09 ...
Page 66: ...Page 4 of 7 28JUL09 ...
Page 67: ...Page 5 of 7 28JUL09 ...
Page 68: ...Page 6 of 7 28JUL09 ...
Page 69: ...Page 7 of 7 28JUL09 ...
Page 70: ......
Page 73: ......
Page 76: ......
Page 77: ......
Page 80: ...Figure 4 ...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATION ...
Page 86: ......
Page 97: ...MAINTENANCE ...
Page 98: ......
Page 100: ...SL 240 MAI 4 2 05 2020 ...
Page 114: ......
Page 115: ...PARTS LIST ...
Page 116: ......
Page 117: ...52H05 REV D SL 240 SWAPLOADER HOIST BASE ASS Y 5 3 2 4 5 3 7 4 1 1 ...
Page 120: ...OUTER TUBE SUB ASSEMBLY SL 240 51H99 REV B ...
Page 122: ...FIXED JIB SUB ASSEMBLY SL 240 52H57 ...
Page 124: ......
Page 129: ...OPTIONS ...
Page 130: ......
Page 135: ...EHV TANK CIRCUIT SL 220 222 240 91H29 REV A ...
Page 136: ...EHV SUB ASSY PUMP CIRCUIT 200 SERIES 91H31 ...
Page 137: ...T M U S A LTD EHV VALVE HOSE CIRCUIT 200 SERIES 91H32 ...
Page 138: ......
Page 139: ......