SL-240.MAI
4-9
05/2020
JIB LOCKOUT VALVE INSPECTION & ADJUSTMENT INSTRUCTIONS
All SwapLoader hook-lift hoists have a jib lockout valve (see illustration below) to prevent
accidental operation of the telescopic jib, while the hoist is up in a dump mode. Because the jib
lockout valve can block the flow of hydraulic oil to the jib cylinder, should the valve come out of
adjustment the telescopic jib may experience a reduction in extension or retraction speed to the
point of stalling out.
INSPECTION
When a noticeable loss in extension or retraction speed of the telescopic jib is experienced, the
first step should be to inspect the jib lockout valve and valve mount ramp to ensure that they are
adjusted properly and in good working order. The jib lockout valve is located on the inside rail
of the hoist mainframe approximately two-thirds of the way back on the driver side of the hoist
(see Drawing No. 52H04 in the Part List pages of the manual). Visually inspect the jib lockout
valve roller and the condition of the valve ramp on the hoist pivot joint without a container on
the hoist (see illustration on the next page); this is most easily performed with the hoist back in a
dismount mode. If either part shows signs of wear or damage then replace or repair as needed.
With the jib lockout valve roller and valve ramp in good condition the next step is to check that
the valve is positioned correctly with respect to the valve ramp. While looking at the roller end
of the jib lockout valve, notice that the roller moves in and out of an end cap. With the hoist
pivot joint in the down position, or horizontal to the hoist mainframe, the valve ramp should be
in contact with the jib lockout valve roller. The roller should be depressed by the valve ramp so
that 1/8” to 3/16” of the roller is exposed from the end cap (see illustrations above and on next
page).
JIB LOCKOUT VALVE ILLUSTRATION
Roller
End Cap
Spring Cap
Summary of Contents for SL-240
Page 1: ...Model SL 240 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 23: ...SL 240 INS 2 5 05 2020 ...
Page 25: ...SL 240 INS 2 7 05 2020 ...
Page 26: ...SL 240 INS 2 8 05 2020 ...
Page 31: ...SL 240 INS 2 13 05 2020 ...
Page 36: ...SL 240 INS 2 18 05 2020 ...
Page 41: ...SL 240 INS 2 23 05 2020 ...
Page 42: ...SL 240 INS 2 24 05 2020 ...
Page 43: ...SL 240 INS 2 25 05 2020 ...
Page 44: ......
Page 45: ......
Page 48: ......
Page 49: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 60: ......
Page 61: ......
Page 65: ...Page 3 of 7 28JUL09 ...
Page 66: ...Page 4 of 7 28JUL09 ...
Page 67: ...Page 5 of 7 28JUL09 ...
Page 68: ...Page 6 of 7 28JUL09 ...
Page 69: ...Page 7 of 7 28JUL09 ...
Page 70: ......
Page 73: ......
Page 76: ......
Page 77: ......
Page 80: ...Figure 4 ...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATION ...
Page 86: ......
Page 97: ...MAINTENANCE ...
Page 98: ......
Page 100: ...SL 240 MAI 4 2 05 2020 ...
Page 114: ......
Page 115: ...PARTS LIST ...
Page 116: ......
Page 117: ...52H05 REV D SL 240 SWAPLOADER HOIST BASE ASS Y 5 3 2 4 5 3 7 4 1 1 ...
Page 120: ...OUTER TUBE SUB ASSEMBLY SL 240 51H99 REV B ...
Page 122: ...FIXED JIB SUB ASSEMBLY SL 240 52H57 ...
Page 124: ......
Page 129: ...OPTIONS ...
Page 130: ......
Page 135: ...EHV TANK CIRCUIT SL 220 222 240 91H29 REV A ...
Page 136: ...EHV SUB ASSY PUMP CIRCUIT 200 SERIES 91H31 ...
Page 137: ...T M U S A LTD EHV VALVE HOSE CIRCUIT 200 SERIES 91H32 ...
Page 138: ......
Page 139: ......