SL-240.INS
2-9
05/2020
6.
Attach the control cables to the control levers and route the cable through the holes in the
cab. Install the control levers in the console. Levers should be installed such that when
the levers are pushed forward the control cable is extended. See Drawing No. 90H64
(Manual Control Assembly) for control lever orientation.
7.
Route the cables to the control valve location and attach them to the control valve with
the bonnet connection kits provided (Pt. No. 20P10). See the following instruction sheet
for installation procedures. The control cables supplied are 84 inches long. Your
particular mounting may require different length control cables, which can be purchased
locally or through Swaploader. Take proper care when routing the control cables, as a
good cable path is essential for a proper operating system. Keep bends in the cable path
to a minimum and be as generous as possible. Under no circumstances should any bend
be tighter than an 8" radius. Protect the cable from heat above 225 degrees F. and avoid
hot areas such as exhaust pipes, etc. Protect the cable from physical damages such as
pinching or crushing, and do not use cable supports, which may crush or deform the
cable. Allow room for flexing where the cable is attached to moving parts of the
equipment, so that the cable is neither kinked nor stretched.
Summary of Contents for SL-240
Page 1: ...Model SL 240 Parts and Operations Manual Hoist Serial Number ____________________ ...
Page 2: ......
Page 4: ......
Page 6: ......
Page 7: ...INTRODUCTION ...
Page 8: ......
Page 15: ...INTRODUCTION 1 7 09 2009 90P52 PROP DECAL OPTIONAL 90P78 HIGH PRESSURE FLUID ...
Page 16: ......
Page 17: ...INSTALLATION ...
Page 18: ......
Page 23: ...SL 240 INS 2 5 05 2020 ...
Page 25: ...SL 240 INS 2 7 05 2020 ...
Page 26: ...SL 240 INS 2 8 05 2020 ...
Page 31: ...SL 240 INS 2 13 05 2020 ...
Page 36: ...SL 240 INS 2 18 05 2020 ...
Page 41: ...SL 240 INS 2 23 05 2020 ...
Page 42: ...SL 240 INS 2 24 05 2020 ...
Page 43: ...SL 240 INS 2 25 05 2020 ...
Page 44: ......
Page 45: ......
Page 48: ......
Page 49: ......
Page 52: ......
Page 53: ......
Page 56: ......
Page 57: ......
Page 60: ......
Page 61: ......
Page 65: ...Page 3 of 7 28JUL09 ...
Page 66: ...Page 4 of 7 28JUL09 ...
Page 67: ...Page 5 of 7 28JUL09 ...
Page 68: ...Page 6 of 7 28JUL09 ...
Page 69: ...Page 7 of 7 28JUL09 ...
Page 70: ......
Page 73: ......
Page 76: ......
Page 77: ......
Page 80: ...Figure 4 ...
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ...OPERATION ...
Page 86: ......
Page 97: ...MAINTENANCE ...
Page 98: ......
Page 100: ...SL 240 MAI 4 2 05 2020 ...
Page 114: ......
Page 115: ...PARTS LIST ...
Page 116: ......
Page 117: ...52H05 REV D SL 240 SWAPLOADER HOIST BASE ASS Y 5 3 2 4 5 3 7 4 1 1 ...
Page 120: ...OUTER TUBE SUB ASSEMBLY SL 240 51H99 REV B ...
Page 122: ...FIXED JIB SUB ASSEMBLY SL 240 52H57 ...
Page 124: ......
Page 129: ...OPTIONS ...
Page 130: ......
Page 135: ...EHV TANK CIRCUIT SL 220 222 240 91H29 REV A ...
Page 136: ...EHV SUB ASSY PUMP CIRCUIT 200 SERIES 91H31 ...
Page 137: ...T M U S A LTD EHV VALVE HOSE CIRCUIT 200 SERIES 91H32 ...
Page 138: ......
Page 139: ......