![Swan Analytical Instruments A-85.119.010 Manual Download Page 92](http://html1.mh-extra.com/html/swan-analytical-instruments/a-85-119-010/a-85-119-010_manual_1411374092.webp)
8 - Installation
Instrument Setup
8.6 Instrument Setup
This section describes the act of operating, testing and
adjusting the system for the first time to ensure that it functions
according to the specified performance.
8.6.1 Preparatory
Tasks
Check
Š
Transmitter cover
closed.
WARNING
Before setting up the instrument, make sure the transmitter
cover is closed, the 4 captive screws tightened.
Š
Power available.
Š
Pumps and valves are in working order.
Š
Sample pipe, strainers and filters are flushed and clean.
No foreign matter allowed in the sample supply line!
Š
Sample flow must be sufficient to setup and operate
the instrument.
ATTENTION
Make sure the sample conforms with the specifications!
84
AMI Trides
Operator’s Manual, A-96.250.101
Summary of Contents for A-85.119.010
Page 10: ...1 AMI Trides keys 2 AMI Trides Operator s Manual A 96 250 101...
Page 15: ...2 Safety Instructions General 2 2 1 AMI Trides Operator s Manual A 96 250 101 7...
Page 20: ...3 3 1 2 AMI Trides pH 3 2 3 12 AMI Trides Operator s Manual A 96 250 101...
Page 32: ...3 Structure and Function Software 24 AMI Trides Operator s Manual A 96 250 101...
Page 40: ...5 Diagnostics Menu Diagnostics 2 32 AMI Trides Operator s Manual A 96 250 101...
Page 64: ...6 Maintenance Repair Calibration 56 AMI Trides Operator s Manual A 96 250 101...
Page 76: ...7 Operation Logger 4 4 optional 68 AMI Trides Operator s Manual A 96 250 101...
Page 123: ...8 Installation Instrument Setup AMI Trides Operator s Manual A 96 250 101 115...
Page 128: ...9 Shut Down Transport Disposal Disposal 120 AMI Trides Operator s Manual A 96 250 101...