![Swan Analytical Instruments A-85.119.010 Manual Download Page 54](http://html1.mh-extra.com/html/swan-analytical-instruments/a-85-119-010/a-85-119-010_manual_1411374054.webp)
6 - Maintenance - Repair
Replacing Parts
6.4.5 Trides reference
electrode
Replace after 3 to 4 years of operation.
1
Shut down the instrument according to
6.3.1,
36
.
2
Unscrew the
connector from the
sensor top.
3
Loosen the sensor
fixing bush and
remove the
electrode.
4
Install in reverse order. Insert the Trides reference electrode
as far as it goes.
5
Observe the
Run-in periods
. Perform
Process Trides
calibration, see
6.
5 “Calibration”,
49
.
6.4.6 Flow control
valve
Note:
If the instrument is configured for ozone (
26.111.0x
1
, see
type plate), make sure to use ozone-resistant O-rings.
1
Shut down the
instrument according
to
6.3.1, 36
.
2
Unscrew flow control
valve.
3
Install in reverse
order. If dry, apply a
thin film of PTFE
grease to O-rings.
46
AMI Trides
Operator’s Manual, A-96.250.101
Summary of Contents for A-85.119.010
Page 10: ...1 AMI Trides keys 2 AMI Trides Operator s Manual A 96 250 101...
Page 15: ...2 Safety Instructions General 2 2 1 AMI Trides Operator s Manual A 96 250 101 7...
Page 20: ...3 3 1 2 AMI Trides pH 3 2 3 12 AMI Trides Operator s Manual A 96 250 101...
Page 32: ...3 Structure and Function Software 24 AMI Trides Operator s Manual A 96 250 101...
Page 40: ...5 Diagnostics Menu Diagnostics 2 32 AMI Trides Operator s Manual A 96 250 101...
Page 64: ...6 Maintenance Repair Calibration 56 AMI Trides Operator s Manual A 96 250 101...
Page 76: ...7 Operation Logger 4 4 optional 68 AMI Trides Operator s Manual A 96 250 101...
Page 123: ...8 Installation Instrument Setup AMI Trides Operator s Manual A 96 250 101 115...
Page 128: ...9 Shut Down Transport Disposal Disposal 120 AMI Trides Operator s Manual A 96 250 101...