![Swan Analytical Instruments A-85.119.010 Manual Download Page 53](http://html1.mh-extra.com/html/swan-analytical-instruments/a-85-119-010/a-85-119-010_manual_1411374053.webp)
6 - Maintenance - Repair
Replacing Parts
6.4.4 Trides sensor, Rotor for Trides Pt/Pt sensor
Note:
If the instrument is configured for ozone (
26.111.0x
1
, see
type plate), make sure to use ozone-resistant O-rings.
1
Shut down the instrument according to
6.3.1
“Instrument
Shutdown”, 36
.
2
Disconnect the disinfectant sensor cable. Put the cable
aside as to prevent it from getting wet.
ATTENTION
Handle the disinfectant sensor with care.
Š
Do not touch the platinum parts with metallic objects.
Š
When removing the disinfectant sensor, residual water
will pour out. Prevent electrical connections from getting
wet.
3
Hold the disinfectant sensor to
prevent it from falling down.
4
Unscrew the knurled nuts and
remove the sensor.
5
Remove the rotor.
6
Install in reverse order.
7
Observe the
Run-in periods
. Perform
Process Trides
calibration, see
6.
5 “Calibration”, 49
.
AMI Trides Operator’s Manual, A-96.250.101
45
Summary of Contents for A-85.119.010
Page 10: ...1 AMI Trides keys 2 AMI Trides Operator s Manual A 96 250 101...
Page 15: ...2 Safety Instructions General 2 2 1 AMI Trides Operator s Manual A 96 250 101 7...
Page 20: ...3 3 1 2 AMI Trides pH 3 2 3 12 AMI Trides Operator s Manual A 96 250 101...
Page 32: ...3 Structure and Function Software 24 AMI Trides Operator s Manual A 96 250 101...
Page 40: ...5 Diagnostics Menu Diagnostics 2 32 AMI Trides Operator s Manual A 96 250 101...
Page 64: ...6 Maintenance Repair Calibration 56 AMI Trides Operator s Manual A 96 250 101...
Page 76: ...7 Operation Logger 4 4 optional 68 AMI Trides Operator s Manual A 96 250 101...
Page 123: ...8 Installation Instrument Setup AMI Trides Operator s Manual A 96 250 101 115...
Page 128: ...9 Shut Down Transport Disposal Disposal 120 AMI Trides Operator s Manual A 96 250 101...