9-12 FUEL SYSTEM
INSPECTION
• Inspect the following parts for damage:
Jet needle
Throttle valve
Float
• Inspect the following jets for clogging:
Main jet
Slow jet
Starter jet
Power jet
• Inspect the needle valve for wear.
• Measure the float height with a vernier caliper. To measure
the float height, tilt the carburetor until the float tip just con-
tacts the float valve.
"
Standard float height: 6.5 ± 1.0 mm (0.26 ± 0.04 in)
REASSEMBLY AND REMOUNTING
Reassemble the carburetor in the reverse order of removal. Pay
attention to the following pints:
NOTE:
Fit the projection of throttle valve collar in the groove of cable
holder.
NOTE:
Set the throttle position sensor guide roller as shown when
installing the throttle valve into the carburetor body.
Good
Worm
Summary of Contents for RM 250 2003
Page 1: ...OWNER S SERVICE MANUAL...
Page 61: ...6 2 KICK STARTER CONSTRUCTION 10 N m 1 0 kgf m 7 0 lb ft 23 N m 2 3 kgf m 16 5 lb ft...
Page 85: ...9 2 FUEL SYSTEM CONSTRUCTION 4 5 N m 0 45 kgf m 3 25 lb ft...
Page 100: ...10 2 COOLING SYSTEM CONSTRUCTION 5 5 N m 0 55 kgf m 4 0 lb ft 10 N m 1 0 kgf m 7 0 lb ft...
Page 198: ...18 TROUBLESHOOTING 18 1 CONTENTS TROUBLESHOOTING TROUBLESHOOTING 18 2 ENGINE 18 2 CHASSIS 18 5...