ELECTRICAL SYSTEM 6-51
SERVICING
Visually inspect the surface of the battery container. If any signs
of cracking or electrolyte leakage from the sides of the battery
have occurred, replace the battery with a new one. If the battery
terminals are found to be coated with rust or an acidic white
powdery substance, clean the battery terminals with sandpaper.
RECHARGING OPERATION
• Using the multi circuit tester, check the battery voltage. If the
voltage reading is the 12.0 V (DC) and less, recharge the bat-
tery with a battery charger.
A
Charging period
B
Stop charging
#
Recharging time: 0.9 A for 5 to 10 hours or 4 A for 1 hour
#
• After recharging, wait for 30 minutes and more and check the
battery voltage with a multi circuit tester.
• If the battery voltage is the 12.5 V and less, recharge the bat-
tery again.
• If battery voltage is still 12.5 V and less, after recharging,
replace the battery with a new one.
• When the motorcycle is not used for a long period, check the
battery every 1 month to prevent the battery discharge.
* When recharging the battery, remove the battery
from the motorcycle.
* Do not remove the caps on the battery top while
recharging.
Be careful not to permit the charging current to
exceed 5 A at any time.
(V)
(at 0 ˚– 40 ˚C)
14
13
12
11
10
100
Battety charged condition
75
50
25
0 (%)
Summary of Contents for GSF650
Page 1: ...GSF650 S...
Page 34: ...PERIODIC MAINTENANCE 2 21...
Page 86: ...3 50 ENGINE Remove the 2nd driven gear bushing A Remove the oil seal B...
Page 90: ...3 54 ENGINE...
Page 103: ...ENGINE 3 67 BOND 1207B should be applied to the following locations The line of BOND...
Page 130: ...3 94 ENGINE ENGINE LUBRICATION SYSTEM...
Page 132: ...3 96 ENGINE CYLINDER HEAD COOLING SYSTEM...
Page 145: ...4 10 FUEL SYSTEM I D NO LOCATION Each carburetor has an I D number 1 printed on its body...
Page 332: ...Prepared by November 2004 Part No 99500 36150 01E Printed in Japan 340...
Page 333: ...Printed in Japan K5...