2-6
S
UPER
S
ERVER 6014P-8/6014P-8R/6014P-82R/6014P-82 User's Manual
Figure 2-3. Installing the Server into a Rack
Installing the Server into the Rack
You should now have rails attached to both the chassis and the rack unit.
The next step is to install the server into the rack. Do this by lining up the
rear of the chassis rails with the front of the rack rails. Slide the chassis
rails into the rack rails, keeping the pressure even on both sides (you may
have to depress the locking tabs when inserting). See Figure 2-3.
When the server has been pushed completely into the rack, you should
hear the locking tabs "click". Finish by inserting and tightening the thumb-
screws that hold the front of the server to the rack.
Summary of Contents for SUPERSERVER 6014P-8
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual...
Page 25: ...Chapter 2 Server Installation 2 9 Figure 2 5 Accessing the Inside of the System...
Page 30: ...3 4 SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual Notes...
Page 60: ...5 26 SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual Notes...
Page 73: ...Chapter 6 Advanced Chassis Setup 6 13 Figure 6 6 Reconfiguring the Power Supply Step 2 Step 1...
Page 74: ...6 14 SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual Notes...
Page 91: ...Chapter 7 BIOS 7 17 P3V3 P5V P1V8 P2V5 HECETA_MEM_VTT PIVO_NIC N12V_Scaled P3V3_STBY...
Page 102: ...A 6 SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual Notes...
Page 126: ...C 4 SUPERSERVER 6014P 8 6014P 8R 6014P 82R 6014P 82 User s Manual Notes...