Chapter 2: Server Installation
2-9
2-6 Preparing to Power On
Next, you should check to make sure the peripheral drives and the SATA drives and
backplane have been properly installed and all connections have been made.
Checking the SATA drives
The SATA disk drives are accessable from the front of the server and can be
1.
installed and removed from the front of the chassis without removing the top
chassis cover.
Depending upon your system's confi guration, your system may have one or
2.
more drives already installed. If you need to install SATA drives, please refer
to Chapter 6.
Checking the Airfl ow
Airfl ow is provided by six sets of 4-cm PWM fans (each set of fans consists
1.
of two fans that are mounted back to back) and an air shroud. The system
component layout was carefully designed to direct suffi cient cooling airfl ow to
the components that generate the most heat.
Note that all power and data cables have been routed in such a way that they
2.
do not block the airfl ow generated by the fans.
Providing Power
Plug the power cords from the power supplies unit into a high-quality power
1.
strip that offers protection from electrical noise and power surges.
It is recommended that you use an uninterruptible power supply (UPS).
2.
Finally, depress the power on button on the front of the chassis.
3.
Summary of Contents for SUPERSERVER 1026TT-IBQF
Page 5: ...v Preface Notes...
Page 16: ...1 8 SUPERSERVER 1026TT TF 1026TT IBXF 1026TT IBQF User s Manual Notes...
Page 30: ...3 4 SUPERSERVER 1026TT TF 1026TT IBXF 1026TT IBQF User s Manual Notes...
Page 58: ...5 24 SUPERSERVER 1026TT TF 1026TT IBXF 1026TT IBQF User s Manual Notes...
Page 94: ...7 28 SUPERSERVER 1026TT TF 1026TT IBXF 1026TT IBQF User s Manual Notes...
Page 96: ...A 2 SUPERSERVER 1026TT TF 1026TT IBXF 1026TT IBQF User s Manual Notes...