Chapter 5: Optional Accessories
5-17
3. On the SuperRack EIA posts
(front and rear), attach cage nuts
with the nuts facing the inside
of the rack. Mount all cage nuts
above and below the same EIA
post number.
4. Mount and screw the front of
the brackets onto the cage nuts
mounted on the front EIA post
(from Step 3) with two panel
screws for each post.
Make sure the front of each bracket
is tightly screwed onto its EIA
post.
5. Mount the cable management
trough on the outside of the
rear EIA posts and screw it and
the rear brackets together with
a panel screw through the rear
cage nuts. Do this one screw at
a time until all four rear screws
are tightly securing both the cable
management trough and the rear
of the brackets together.
6. Slide on the cable management
trough cover. The bracket and
cable trough are ready for
mounting a rack component.
Uninstalling Brackets with a Cable Management Trough
To uninstall a brackets with a cable management trough, follow the previous
procedure in reverse. First unscrew the panel screws in the rear EIA posts, unmount
the cable trough, and then unscrew the brackets from the front EIA post and remove
the brackets.