3-10
SuperRack Installation Manual
3. Move the EIA posts that face the front of the rack all the way forward till they
touch the outer frame front.
4. Adjust the distance between the front and back posts to approximately
742mm distance.
Note:
The distance on top must match the measurement on the bottom.
5. Tighten the screws on the rear of each of the EIA mounting posts fully to
secure them to each of the rack frame's horizontal struts (see Figure 3-10).
Figure 3-10. Rack with Installed EIA Posts