Chapter 2: Server Installation
2-5
Figure 2-2. Installing the Chassis into a Telco Rack
Telco Rack
The SC505 chassis supports Telco Rack installation. Its compact design allows it
to be installed into a Telco rack without the use of rails.
Note
: Figures are for illustrative purposes only. Servers should always be installed
in racks from the bottom up.
Installing the Chassis into a Telco (Two-Post Style) Rack
To install the chassis into a Telco style two-post rack, use two L-shaped brackets
on either side of the chassis (four total).
1. Determine how far the server will extend out the front of the rack. Larger
chassis should be positioned to balance the weight between front and back.
2. If a bezel is included on your chassis, remove it.
3. Attach the two front brackets to each side of the chassis.
Warning:
do not pick up the server with the front handles. They are de-
signed to pull the system from a rack only.
Summary of Contents for 5018A-FTN4
Page 1: ...SUPERSERVER 5018A FTN4 SUPER USER S MANUAL 1 0...
Page 5: ...Notes Preface v...
Page 22: ...SUPERSERVER 5018A FTN4 User s Manual 3 4 Notes...
Page 42: ...4 20 SUPERSERVER 5018A FTN4 User s Manual Notes...
Page 62: ...5 20 SUPERSERVER 5018A FTN4 User s Manual Notes...
Page 110: ...A 2 SUPERSERVER 5018A FTN4 User s Manual Notes...