
Chapter 2: Server Installation
2-3
2-4
Installing the SuperServer 6013P-T into a Rack
This section provides information on installing the SuperServer 6013P-T
into a rack unit with the rack rails provided. If the 6013P-T has already
been mounted into a rack, you can skip ahead to Sections 2-5 and 2-6.
There are a variety of rack units on the market, which may mean the
assembly procedure will differ slightly. You should also refer to the
installation instructions that came with the rack unit you are using.
Identifying the Sections of the Rack Rails
You should have received a rack mounting kit with the SuperServer 6013P-T.
The kit includes two sets of chassis rails (four pieces total, two of which
are already installed on the chassis) and two sets of rack rails (four pieces
total). Figure 2-1 displays the two right-side chassis rails and the two right-
side rack rails. Note that two of the four chassis rails (Chassis Rail 1) are
already attached to the chassis.
Installing the Rack Rails
Begin by joining one set of rack rails corresponding to either the left or the right
side of the rack. Do this by aligning the studs of one rail with the holes of the
other rail. Push the studs into the grooved holes and then push the rail to slide
the studs to the end of the groove. Repeat this with the rack rails used for the
other side.
Next, determine where you want to place the SuperServer 6013P-T in the rack.
(See Rack and Server Precautions in Section 2-3.) Position the assembled rack
rails at the desired location in the rack. Screw the assembly securely to the
rack using the brackets provided. Attach the other assembly to the other side
of the rack, making sure both are at the exact same height and with the rail
guides facing inward.
Locking Tabs:
Both of the two chassis rails on each side have a locking tab
(four total), which serves two functions. The first is to lock the server into
place when installed and pushed fully into the rack, which is its normal operat-
ing position.
Secondly, these tabs also lock the server in place when extended from the
rack. This prevents the server from coming completely out of the rack when
you pull it out for servicing. The two sets of locking tabs mean there are two
locked positions when the chassis is extended from the rack, allowing easy
access when servicing the system. Note that on one side, you push the
locking tab up to release it and on the other side you push it down to release.
Summary of Contents for SuperServer 6013P-T
Page 1: ...SUPERSERVER 6013P T USER SMANUAL 1 0a SUPER...
Page 5: ...v Preface Notes...
Page 10: ...SUPERSERVER 6013P T User s Manual x Notes...
Page 18: ...SUPERSERVER 6013P T Manual 1 8 Notes...
Page 28: ...2 10 SUPERSERVER 6013P T Manual Notes...
Page 32: ...3 4 SUPERSERVER 6013P T User s Manual Notes...
Page 40: ...5 4 SUPERSERVER 6013P T User s Manual Figure 5 2 Heatsink Installation...
Page 92: ...7 24 SUPERSERVER 6013P T Manual Notes...
Page 98: ...A 6 SUPERSERVER 6013P T Manual Notes...
Page 104: ...B 6 SUPERSERVER 6013P T Manual Notes...
Page 120: ...C 16 SUPERSERVER 6013P T Manual...