Chapter 5: Advanced Serverboard Setup
5-7
1. There are two levers on the
LGA2011 socket. First press and
release the load lever labeled
'Open 1st'.
Installing an LGA 2011 Processor
5-5 Installing the Processor and Heatsink
Caution:
When handling the processor package, avoid placing direct pressure on
the label area of the fan.
Notes:
•
Always connect the power cord last and always remove it before adding,
removing or changing any hardware components. Make sure that you install the
processor into the CPU socket before you install the CPU heatsink.
•
If you buy a CPU separately, make sure that you use an Intel-certifi ed multi-
directional heatsink only.
•
Make sure to install the serverboard into the chassis before you install the CPU
heatsinks.
•
When receiving a serverboard without a processor pre-installed, make sure that
the plastic CPU socket cap is in place and none of the socket pins are bent;
otherwise, contact your retailer immediately.
•
Refer to the
Supermicro
web site for updates on CPU support.
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
OPEN 1st
OPEN
1st
WARNING!
WAR
NIN
G!
Press down on the lever labeled
'Close 1st'
Pull lever away
from the socket
2. Press the second load lever
labeled 'Close 1st' to release the
load plate from its locked position.
Summary of Contents for SUPERSERVER 1028R-WC1R
Page 1: ...SUPERSERVER 1028R WC1R 1028R WC1RT USER S MANUAL Revision 1 0b ...
Page 5: ...Notes Preface v ...
Page 10: ...Notes SUPERSERVER 1028R WC1R T USER S MANUAL x ...
Page 26: ...2 10 SUPERSERVER 1028R WC1R T USER S MANUAL Notes ...
Page 82: ...5 32 SUPERSERVER 1028R WC1R T USER S MANUAL Notes ...
Page 90: ...6 8 SUPERSERVER 1027R 73DBRF User s Manual Notes ...
Page 122: ...7 32 SUPERSERVER 1028R WC1R T USER S MANUAL Notes ...
Page 124: ...A 2 SUPERSERVER 1028R WC1R T USER S MANUAL Notes ...