6-8
S
UPER
S
ERVER 8042-8/8042-6 Manual
Pulling the carrier out
Figure 6-5. Removing SCSI Drives
Release Button
Handle
2.
Installing/removing hot-swap SCSI drives:
Four SCSI drive bays are located in the front of the chassis, making them
easily accesible to install and remove. The SCSI drives can be removed
and installed without powering down the system (hot-swap). To remove,
first push the release button located beside the drive LEDs, then swing
the burgundy colored handle fully out and use it to pull the unit straight
out (see Figure 6-5).
Note:
Your Operating System must have RAID
support to enable the hot-plug capability of the SCSI drives.
!
Important: Regardless of how many SCSI hard drives
are installed, all 4 SCSI drive carriers must remain in
the drive bays to maintain proper airflow.
Summary of Contents for 8042-6
Page 1: ...SUPERSERVER 8042 8 SUPERSERVER 8042 6 USER SMANUAL 1 0a SUPER SUPERMICR ALARM RESET R...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 8042 8 8042 6 Manual...
Page 22: ...2 6 SUPERSERVER 8042 8 8042 6 Manual Figure 2 4 Installing the Server Into the Rack A C B...
Page 26: ...2 10 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 39: ...Chapter 5 Advanced Serverboard Setup 5 5 Figure 5 2 Heatsink Fan Installation...
Page 62: ...5 28 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 100: ...7 26 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 102: ...SUPERSERVER 8042 8 8042 6 Manual A 2 Notes...