Chapter 2: Server Installation
2-5
Figure 2-3. Installing the Rack Rails
Installing the Server Into the Rack:
You should now have rails attached to both the chassis and the rack
unit. The next step is to install the server into the rack. Do this by
lining up the rear of the chassis rails with the front of the rack rails.
Slide the chassis rails into the rack rails, keeping the pressure even on
both sides (you may have to depress the locking tabs when inserting).
See Figure 2-4 on the next page.
When the server has been pushed completely into the rack, you should
hear the locking tabs "click". Finish by inserting and tightening the
thumbscrews that hold the front of the server to the rack.
Summary of Contents for 8042-6
Page 1: ...SUPERSERVER 8042 8 SUPERSERVER 8042 6 USER SMANUAL 1 0a SUPER SUPERMICR ALARM RESET R...
Page 5: ...v Preface Notes...
Page 10: ...Notes x SUPERSERVER 8042 8 8042 6 Manual...
Page 22: ...2 6 SUPERSERVER 8042 8 8042 6 Manual Figure 2 4 Installing the Server Into the Rack A C B...
Page 26: ...2 10 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 39: ...Chapter 5 Advanced Serverboard Setup 5 5 Figure 5 2 Heatsink Fan Installation...
Page 62: ...5 28 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 100: ...7 26 SUPERSERVER 8042 8 8042 6 Manual Notes...
Page 102: ...SUPERSERVER 8042 8 8042 6 Manual A 2 Notes...